Projects create a better future
China Chengda Engineering Co. Ltd. (abbreviated as Chengda) is a wholly-owned subsidiary of China National Chemical Engineering Group Corporation Ltd, located in Chengdu, a famous cultural city in southwest China. It was formerly No. 8 Design Institute under the Ministry of Chemical Industry. Since its official founding in 1958, by decades of work and effort, Chengda has grown into an international integrated engineering-driven EPC contractor.
MoreRecently, the China Petroleum and Chemical Industry Federation held a release ceremony for trusted service providers in the Chinese petroleum and chemical industry in Fuzhou, and Chengda was successfully selected as one of the first batch of trusted digital service providers in the Chinese petrochemical industry.
On September 8th. the intermediate handover celebration for the Phase III 104,000 MTPA BDO project and Phase II 46,000 MTPA PTMEG project of Xinjiang Lanshan Tunhe Energy Co., Ltd. which are EPC contracted by Chengda, was held in Qitai County, Changji Prefecture, Xinjiang.
At 4:00am local time on September 1st. Saudi Arabia, with the highly efficient reaction of Chengda’s core patented equipment - carbonization tower, the ISSAC soda ash and calcium chloride project EPC contracted by Chengda was successfully put into operation at one-time, with product indicators better than the contract agreement.
On August 31st. the PTMEG4 plant of PTMEG and PBAT new material industry chain integration project of Inner Mongolia Huaheng Energy Technology Co., Ltd. which was EPC contracted by Chengda, was successfully started up at one-time and successfully produced qualified products.
Recently, the 2023 Sichuan Provincial Excellent Engineering Survey and Design Achievement Award and the Excellent Engineering Survey and Design Project Award of China Petroleum and Chemical Engineering Survey and Design Association were successively announced.
Recently, the "MARAN GAS CORONIS" transport ship carrying 120,000 cubic meters of LNG docked at the specialized terminal of Guangzhou LNG emergency peak shaving gas source station. After completing the low-temperature nitrogen precooling and pre unloading preparation work of the unloading system, the next day, the LNG unloading system cooling and filling, LNG storage tank pre cooling and LNG unloading work began.
CNOOC Natural Gas Fertilizer Project
China Shenhua (Baotou) Charcoal Chemical Co., Ltd.
Sinopec Qilu Petrochemical Company
Uzbekistan National Chemical Industry Corporation